Illustration: a storm with lightning and heavy rain moving over a city, its river, roads, power lines and water treatment plant.

Building Alerts

Know when the weather turns on your building

Building-focused alerts when local conditions may matter to a building: what the weather may touch, and what to check before and after.

Early access. Building Alerts is not operating yet and no alerts are being sent.

Illustration, not a forecast or alert area

From Earth conditions to building action

How Building Alerts works

Building Alerts connects the official warning for your area with what it can mean for a building, and what is worth checking before, during and after the event.

  1. The official warning

    The warning in effect for the area you confirm, with its issuing authority, timing and link, as published.

  2. What it may touch

    The building systems and parts that condition acts on, drawn from official and government guidance.

  3. A few things to check

    Plain, safe steps to consider, with links to the public authority and into the ICI tools.

  4. A record afterwards

    What you checked and what happened, kept with the building for the next time.

Planned for launch

  • Heavy-rain alerts for buildings, starting in Canada, from the official Environment and Climate Change Canada warning.
  • The official warning first, with its authority, timing and link; ICI’s building guidance below it, marked as ICI’s.
  • An update only when the official warning materially changes, such as a higher colour or a longer period.

In development, not available yet

  • Official forecast amounts and measured conditions in each alert.
  • Historical evidence for the area, where held public records support a fair comparison.
  • Briefings for other infrastructure: commercial, industrial, energy, water and coastal.
  • Other conditions, such as extreme cold, heat and freeze-thaw.
  • Connections to a building’s own history, only where its owner authorizes them.

Local conditions describe an area, not your building. They never change a Condition Profile result, and they may not affect every building in the same way.

Real and current

See the official alerts in effect now

Enter a postal code or ZIP code to see the warnings, watches and advisories the official authority has in effect there right now, exactly as published. This only looks them up: it does not sign you up, and nothing is sent.

Illustrative example

See an example alert

An official warning, what it can mean for the infrastructure you care about, and what to check. Choose a category to see how the guidance changes.

Infrastructure category

Illustrative only: not a current warning, area or subscriber. ICI does not issue official warnings; follow the public authority for your area. Building Alerts is in early access and is not sending alerts.

Heavy rain · yellow warning

Illustrative, not a current warning

Rainfall warning for Example area, Ontario

Official source
Environment and Climate Change Canada
Location
Example area, Ontario
Timing
Jan 20, 7:00 AM to Jan 21, 1:00 PM, 2027 (local time, UTC−5)

Key measurements example values, in development

  • 20 to 40 mm Total rainfall, official forecast range
  • 90 km/h Wind gusts up to, official forecast maximum

Why it matters: Residential home

  • Heavy rain may lead to basement flooding.
  • Heavy rain with power loss may lead to pump failure.
  • Heavy rain may lead to sewer backup.

Source: ECCC Weather Impact Guides: Rain. Not a prediction for any building.

Practical guidance

  1. Close windows and exterior doors before the heaviest rain arrives.
  2. If your building has a basement, move things you want to protect off the floor and check it now and then during the rain.

3 more steps, with safety notes, in the full example email.

Matches the heavy-rain email planned for launch, with ICI-approved steps.

Why it matters: Commercial building

  • Water that stands on a low-slope roof stays in contact with seams, flashings and penetrations for longer.
  • Water that collects on a roof can enter at rooftop equipment curbs, skylights and parapet joints.
  • Parking structures, loading docks and below-grade rooms collect runoff from large paved areas.

General possible effects. Not verified at any property.

Points to review before the rain

  1. Confirm who on the property team receives official alerts and who checks below-grade rooms and loading areas during the rain.
  2. Confirm how to reach the building’s roofing and drainage service providers.

In development: proposed wording. Infrastructure briefings are not sent.

Why it matters: Industrial facility

  • Pits, sumps, trenches and loading docks are where runoff collects first.
  • Secondary containment and spill-control areas open to the sky collect rainwater and can lose capacity.
  • Materials stored outdoors can be wetted or moved by runoff.

General possible effects. Not verified at any property.

Points to review before the rain

  1. Confirm that the site’s stormwater and spill-response plans name who acts during an official rainfall warning.
  2. Confirm that people on shift know the site’s own procedures for rainwater in containment areas.

In development: proposed wording. Infrastructure briefings are not sent.

Why it matters: Electricity infrastructure

  • In general: Surface water reaches below-grade vaults and low substations; saturated soil reduces the stability of poles and trees near lines.

General possible effects. Not verified at any facility.

Guidance for high-consequence facilities

  1. For high-consequence facilities ICI shows official conditions and general published evidence only. ICI gives no operating instructions; operating decisions belong to the facility’s licensed operator and its regulator.

In development: proposed wording. Infrastructure briefings are not sent.

Why it matters: Water and wastewater

  • Overflow points in combined and sanitary sewers are where capacity limits show first.
  • Treatment plants and pumping stations see higher and faster-changing flows.
  • Storm-related power interruptions can affect pumping where backup power is not available.

General possible effects. Not verified at any property.

Points to review before the rain

  1. Confirm that the utility’s wet-weather plan and its regulatory reporting contacts are current.

In development: proposed wording. Infrastructure briefings are not sent.

Why it matters: Solar energy

  • Runoff concentrates along array rows and can erode soil around racking foundations and cable trenches.
  • Inverters, combiner boxes and transformers mounted near grade sit closest to any standing water.
  • Output is lower under heavy cloud and rain; that reduction by itself says nothing about equipment condition.

General possible effects. Not verified at any property.

Points to review before the rain

  1. Confirm that the site’s drainage paths, low spots and ground-level equipment locations are documented and known to the operator.

In development: proposed wording. Infrastructure briefings are not sent.

Why it matters: Wind energy

  • Soft or flooded access roads can delay crews and equipment reaching turbines.
  • Runoff can erode soil around foundations and along collection-system routes, especially near watercourses.

General possible effects. Not verified at any property.

Points to review before the rain

  1. Confirm site access plans for the warning period, including any routes that cross watercourses.

In development: proposed wording. Infrastructure briefings are not sent.

Why it matters: Coastal and marine

  • Low-lying waterfront areas can collect land runoff and high tide at the same time.
  • Rain on docks, floats and moored vessels adds water that has to drain or be pumped out.
  • Runoff can reduce water quality and visibility in harbours.

General possible effects. Not verified at any property.

Points to review before the rain

  1. Compare the official tide predictions for the warning period with the official warning times.

In development: proposed wording. Infrastructure briefings are not sent.

View full example email

Example only. This is not a current warning. The complete heavy-rain email, rendered from the approved template: official source, ICI guidance, safety notes, consent wording and stop controls. Its links are inactive here.

Environment and Climate Change Canada rainfall warning for Example area, Ontario. 5 practical steps to consider. ͏ ͏ ͏

Conditions and buildings

Three examples

  • Extreme cold

    May touch Heating, plumbing and exterior walls

    Check Where water lines run through unheated spaces or exterior walls, and whether there is a backup heat source.

  • Heavy rain

    May touch Roof drainage, the sump pump and below-grade spaces

    Check From a safe spot, that visible drains and downspout outlets are clear, and when the sump pump was last tested.

  • Freeze-thaw

    May touch Exterior walls, sealants, flashings, foundations and drainage

    Watch Photograph and date sealants, masonry joints and flashings from the ground, and note where water sits against the building.

What an alert is intended to contain

  • the local condition and the area you confirmed;
  • the building systems and parts it may touch;
  • a few things to check or record, in plain language;
  • links into the ICI tools that go further;
  • a reminder that official weather and emergency warnings come from the public authority for your area.

What Building Alerts is not

  • Not an official weather or emergency warning. Follow the public authority for your area for warnings and emergency instructions.
  • Not a prediction of damage, a claim or a loss, and not a guarantee that damage will be prevented.
  • Not a change to a Condition Profile. Only information about the building itself can do that.

Go further

Related ICI tools

Managing several buildings? For organizations explains how organizations use ICI.

Privacy and withdrawal

See the Privacy Policy and Terms of Use. You can withdraw at any time.